[1] SAGGAF M M.A vision for future upstream technologies[J].Journal of Petroleum Technology,2008,60(3):54-98.
[2] 崔传智,徐建鹏,王端平,等.特高含水阶段新型水驱特征曲线[J].石油学报,2015,36(10):1267-1271.
CUI Chuanzhi,XU Jianpeng,WANG Duanping,et al.A new water flooding characteristic curve at ultra-high water cut stage[J].Acta Petrolei Sinica,2015,36(10):1267-1271.
[3] 杜庆龙.长期注水开发砂岩油田储层渗透率变化规律及微观机理[J].石油学报,2016,37(9):1159-1164.
DU Qinglong.Variation law and microscopic mechanism of permeability in sandstone reservoir during long-term water flooding development[J].Acta Petrolei Sinica,2016,37(9):1159-1164.
[4] 朱丽红,杜庆龙,姜雪岩,等.陆相多层砂岩油藏特高含水期三大矛盾特征及对策[J].石油学报,2015,36(2):210-216.
ZHU Lihong,DU Qinglong,JIANG Xueyan,et al.Characteristics and strategies of three major contradictions for continental facies multi-layered sandstone reservoir at ultra-high water cut stage[J].Acta Petrolei Sinica,2015,36(2):210-216.
[5] OUYANG Liangbiao.Practical consideration of an inflow control device application for reducing water production[R].SPE 124154,2009.
[6] AUGUSTINE J R,MCINTYRE A,ADAM R J,et al.Increasing oil recovery by preventing early water and gas breakthrough in a west brae horizontal well:a case history[C].SPE 99718,2006.
[7] EBADI F,DAVIES D R,GARDINER A R,et al.Evaluation of added value in reservoir management by application of flow control with intelligent wells[J].Petroleum Geoscience,2008,14(2):183-196.
[8] SU H J,DOGRU A H.Modeling of equalizer production system and smart-well application in full-field studies[J].SPE Reservoir Evaluation & Engineering,2009,12(2):318-328.
[9] SUN Kai,GUO Boyun,SAPUTELLI L.Multinode intelligent-well technology for active inflow control in horizontal wells[J].SPE Drilling & Completion,2011,26(3):386-395.
[10] 王庆,刘慧卿,张红玲,等.油藏耦合水平井调流控水筛管优选模型[J].石油学报,2011,32(2):346-349.
WANG Qing,LIU Huiqing,ZHANG Hongling,et al.An optimization model of completion strings with inner-located nozzle in horizontal wells coupled with reservoirs[J].Acta Petrolei Sinica,2011,32(2):346-349.
[11] 杨进先,李海涛,董社霞,等.底水气藏水平井流入控制阀完井优化方法[J].钻采工艺,2013,36(2):45-47.
YANG Jinxian,LI Haitao,DONG Shexia,et al.Horizontal well completion optimization with inflow control devices in bottom water drive gas reservoirs[J].Drilling & Production Technology,2013,36(2):45-47.
[12] 赵旭,姚志良,刘欢乐.水平井调流控水筛管完井设计方法研究[J].石油钻采工艺,2013,35(1):23-27.
ZHAO Xu,YAO Zhiliang,LIU Huanle.Technical research on well completion design with inflow control device(ICD)in horizontal wells[J].Oil Drilling & Production Technology,2013,35(1):23-27.
[13] AL-KHELAIWI F T,BIRCHENKO V M,KONOPCZYNSKI M R,et al.Advanced wells:a comprehensive approach to the selection between passive and active inflow-control completions[J].SPE Production & Operations,2010,25(3):305-326.
[14] AL-KHELAIWI F T,DAVIES D R.Inflow control devices:application and value quantification of a developing technology[R].SPE 108700,2007.
[15] 王子健,申瑞臣,王开龙,等.基于最优控制理论的智能井动态优化技术[J].石油学报,2012,33(5):887-891.
WANG Zijian,SHEN Ruichen,WANG Kailong,et al.Dynamic optimization techniques of smart wells using optimal control theory[J].Acta Petrolei Sinica,2012,33(5):887-891.
[16] VBIRCHENKO V M,MURADOV K M,DAVIES D R.Reduction of the horizontal well's heel-toe effect with inflow control devices[J].Journal of Petroleum Science and Engineering,2010,75(1/2):244-250.
[17] BIRCHENKO V M,BEJAN A I,USNICH A V,et al.Application of inflow control devices to heterogeneous reservoirs[J].Journal of Petroleum Science and Engineering,2011,78(2):534-541.
[18] LI Zhuoyi,FERNANDES P X,ZHU Ding.Understanding the roles of inflow-control devices in optimizing horizontal-well performance[J].SPE Drilling & Completion,2011,26(3):376-385.
[19] GAVIOLI P,VICARIO R.The evolution of the role of openhole packers in advanced horizontal completions:from novel technology to a critical key to success[J].SPE Drilling & Completion,2012,27(1):75-93.
[20] ATKINSON C,MONMONT F B J.A semi-analytical model for predicting the flow into a wellbore completed by inflow control devices[J].International Journal of Engineering Science,2007,45(2/8):350-363.
[21] VALVATNE P H,SERVE J,DURLOFSKY L J,et al.Efficient modeling of nonconventional wells with downhole inflow control devices[J].Journal of Petroleum Science and Engineering,2003,39(1/2):99-116.
[22] LUO Wei,LI Haitao,WANG Yongqing,et al.A new semi-analytical model for predicting the performance of horizontal wells completed by inflow control devices in bottom-water reservoirs[J].Journal of Natural Gas Science and Engineering,2015,27:1328-1339.
[23] LUO Wei,LI Haitao,WANG Yong-qing,et al.Optimization of the number of openhole packers in horizontal wells completed by inflow control devices for different types of reservoirs[J].Journal of Engineering Research,2015,3(1):149-171.
[24] NEYLON K,REISO E,HOLMES J A,et al.Modeling well inflow control with flow in both annulus and tubing[R].SPE 118909,2009.
[25] YOUNGS B,NEYLON K J,HOLMES J A.Recent advances in modeling well inflow control devices in reservoir simulation[R].IPTC 13925,2009. |